Go to https://pjm.com/Home/planning/services-requests/interconnection-queues and in the grid below you can filter by State(OH), County(s)(Allen,Auglaize), MW (50 or more) and then filter by type of fuel (Solar/Wind) in the grid header to the extreme right column. Then you can see the projects transmission rights and planning. So for instance Birch Solar is
AF1-076 Southwest Lima 138 kV
AF1-077 Southwest Lima 138 kV
AF1-164 Southwest Lima 345 kV
You can then download the Feasibility Study and Impact Study on the Phases and Agreements tab. This is best done on a computer and not on a phone.